What the Supreme Court requires before highway encroachment removal
📑 On this page

A highway inspector marks a wall for removal. The shopkeeper unfolds a deed and points to a boundary on the attached plan. The inspector has a survey that puts the wall inside the highway boundary. Both documents can be genuine and the dispute can still turn on whether they describe the same strip of land.

That is the kind of dispute the Supreme Court addressed on 18 November 2026 in In Re Phalodi Accident v. National Highways Authority of India and Others. The principle is simple enough to use in a CLAT passage. A court can order authorities to clear unauthorised structures across a highway network. Applying that order to one building still requires establishing that the building is an unauthorised occupation of highway land and following the procedure that the law requires.

🎯 In a nutshell
  • The Supreme Court clarified its April highway safety directions on 18 November 2026.
  • The April directions require authorities to identify and clear unauthorised occupation. Individual sites still need to be assessed under the highway law.
  • The ordinary process gives the affected person notice of the land in question and a chance to respond. The Act also contains defined exceptions.
  • The applicants could take their property disputes to the relevant High Courts. Temporary protection covered the structures in those applications while the High Court cases were dealt with.
📌 What CLAT actually expects
Identify the rule in the passage, then look for the facts that trigger it. Check whether the question changes the boundary evidence, the notice procedure or the conditions for making an exception. Each change can lead to a different answer.

First check what the April order decided

The Supreme Court took up concerns about highway safety on its own initiative after crashes at Phalodi in Rajasthan and elsewhere. Lawyers call a proceeding started by the court itself suo motu. The April order directed authorities to inspect stretches of national highways and report what they found, including the action they took against encroachments. It also required the removal of unauthorised structures through the procedure set out in the highway law and the ministry’s operating instructions.

The National Highways Authority of India, or NHAI, had a strong practical argument. The Court had given the authorities an obligation to act, and unauthorised occupation of highway land can put road users in danger. In its responses to some applications, NHAI said that notices had been issued under the Act and that its measurements put the structures within the roadway’s right of way. A right of way here is the strip of land legally set aside for the highway. Its boundary can extend beyond the edge of the tarmac.

The November judgment asked what questions the April order had actually resolved. The April directions applied to a class of structures: those that amounted to unauthorised occupation of national highway land. To bring a particular wall or shop within that class, officials first need a basis for locating it inside the right of way and treating its occupation as unauthorised. The Court kept the road safety duty in place and confirmed that its execution depends on those facts.

Read the word ‘unauthorised’ as a condition. In a practice question about a school clearing vehicles from an emergency lane, a direction to free the lane gives the school a reason to act. The direction leaves a factual question about the bicycle parked by the gate. The answer depends on where the marked lane runs and where the bicycle stands. A demand for a quick result leaves that factual question intact.

Then locate the disputed strip of land

Applicants from places including Valsad and Navsari in Gujarat challenged proposed removal of structures beside a national highway. Their arguments included claims of private ownership, objections to the highway authority’s measurements, and objections to the procedure followed. Several relied on documents about ownership, acquisition or permission. Some asked for lawful acquisition and compensation if the land was required for the highway. Those were the applicants’ claims and requests. The November judgment left the merits for independent examination.

Consider a fictional workshop near Bharuch. Its owner produces a deed for a plot beside the highway. The highway survey puts a corner of the workshop inside the right of way. A reviewer could ask whether the survey and deed use the same plot boundary, whether an acquisition record covers the disputed strip, and whether the workshop’s footprint matches the survey marks on the ground. Acquisition is the legal process by which the government takes land for a public purpose.

Each piece of evidence answers a different question. A deed can help identify the land a person claims. A survey can show where officials have drawn the highway boundary. Acquisition records can help establish whether that particular strip became highway land. If the documents describe different strips or different stages of the same project, the decision-maker needs to reconcile them. It is possible for the owner to have a valid deed for the plot and still be wrong about the location of the workshop wall.

Conversely, an official can accurately measure where the wall stands while relying on an incorrect boundary for highway land. That possibility explains why the court treated both sides’ assertions as matters to examine. The applicant’s statement of ownership cannot itself prevent the use of lawful removal powers. Where the basis for the authority’s claim is disputed, its assertion of a boundary likewise needs to be tested against the records and the applicable law.

Now ask what procedure the law requires

The ordinary removal process starts with an identified occupation on highway land. The authorised administration or officer serves a notice identifying the land and specifying the time to remove the occupation. The notice also states when and where the officer will hear the affected person’s response, called a representation. The person can point out a survey error, provide permissions or show another reasonable cause why the proposed action should not follow. The opportunity matters because the explanation must actually be considered.

Picture a notice sent to the fictional workshop owner that names the front wall but describes the wrong survey plot. To give a meaningful answer, the owner needs to know which land the officer wants cleared. Fixing the plot number can narrow the dispute enough for both sides to compare the same documents. That is what lawyers mean here by natural justice: a fair chance to meet the case before the responsible authority acts through the ordinary process.

Suppose the officer finds the mistake before any removal. In the fictional case, serving a fresh notice that identifies the correct strip and gives the owner time to answer would let the ordinary process proceed on the right facts. A response to the first notice could have concerned a different plot entirely. Even after the correction, the officer would still have to consider evidence about the actual boundary and decide whether the wall occupies highway land without authorisation.

The Act also gives the authority powers to act without prior notice in specified situations. One of those powers covers immediate action to protect traffic or a highway structure where serving notice would cause undue delay. An examiner can change the facts by making an unauthorised obstruction an immediate danger and making the responsible person unavailable. For that exception, the danger and the difficulty of serving notice both matter. There is a separate provision with its own conditions for listed kinds of unauthorised occupation.

The Supreme Court’s point about exceptions is particularly useful. A highway safety order explains the public purpose of the exercise. If an officer relies on a statutory exception, the conditions in that exception supply the legal authority to dispense with notice. In an individual dispute, ask which exception is relied upon and what facts would bring the occupation within it.

Finally check which court will examine the property

The bench left its national road safety directions in operation. To address the applicants’ individual grievances, it let them approach or continue their proceedings before the High Court with jurisdiction, meaning the court with authority to hear the dispute. The High Courts could examine land records, survey reports and acquisition documents, assess whether legal procedure had been followed and, where appropriate, consider whether a question belonged before another competent forum.

The Supreme Court continued interim protection already in place until the relevant High Court proceedings were disposed of. For disputed structures in the applications that had lacked protection, the judgment restrained the authorities from demolition, removal or other coercive action under the challenged notices until that stage. The protection applied to the structures involved in these applications. It gave their owners a chance to have the dispute heard and left ownership and the lawfulness of the structures for decision.

In the fictional workshop example, suppose a court orders the wall to be left alone during review. The immediate result is that the wall stays standing while the case is heard. The workshop owner must still establish the facts supporting the claim. The highway authority can still place its survey before the reviewing court. A later decision can settle an issue that the temporary order merely preserved for hearing.

That distinction helps when a CLAT option says a party’s final right follows from temporary protection. Ask what the court actually ordered, for which property and for how long. The answer may be as narrow as a pause while evidence is checked. In the Phalodi case, the judgment also confined its protection to the disputed structures and expressly excluded permission for fresh construction or encroachment.

Principles and terms to know

Principle or termPlain meaningWhat to check in a passage
General directionA court order aimed at a wider problem or a class of cases.Which condition brings the individual case within the order?
Right of wayThe legally defined strip of land for the highway.Which records establish the boundary and the structure’s location?
Ordinary removal procedureThe affected person receives a proper notice, gets a chance to respond and has the response considered.What land does the notice identify? Was the explanation examined?
Power to act without prior noticeThe highway law permits this in specified circumstances.Do the facts meet the conditions of the particular exception relied on?
Interim protectionA temporary order preserving the position while a dispute is considered.Which structure is protected and when does the protection end?
→ scroll to see more
⚠️ Check the scope of each order
The April direction concerns unauthorised structures on highway land. The November protection concerns the identified structures in the applicants’ disputes. An option about every property near every national highway goes further than either ruling.
ℹ️ Good to know, not to memorise
The judgment is 2026 INSC 1243. Section 26(2)–(6) of the Control of National Highways (Land and Traffic) Act, 2002 sets out the ordinary notice and removal process. Section 26(7) lists kinds of unauthorised occupation for which the authorised officer may act without notice. Section 26(8) separately addresses immediate safety needs where serving notice would cause undue delay. Read the facts against the specific power invoked.

Follow a boundary dispute in Gujarat

🧩 Worked example
In this fictional exercise, a court directing a road safety programme has ordered highway authorities to identify and remove all unauthorised occupation of national highway land. Under the rules of the exercise, the direction requires each officer to check that a structure is inside the highway’s legally defined boundary and that its occupation is unauthorised. A photograph showing that a building stands close to the carriageway may prompt an inspection. To justify removal, the officer needs evidence about the location of the disputed structure in relation to the legal right of way. Under the ordinary procedure, the officer must serve a notice identifying the disputed piece of land and give the affected person a chance to respond. The officer must consider the response before deciding whether removal is lawful. A separate emergency rule allows immediate action without prior notice when an unauthorised occupation on highway land poses an immediate threat to traffic or to a highway structure and timely service of notice is impossible without undue delay. Treat this as the only exception for purposes of the exercise. Near Anand, Meera runs a cycle repair shop. A survey shows the main shop outside the highway boundary but places its awning on the inside. Her deed gives the plot’s measurements from an old marker. She submits a newer survey sketch suggesting that the marker used by the highway officer was moved when a drain was rebuilt. The officer receives the sketch and says that the general court direction authorises removal of the entire shop. The officer schedules removal on the strength of that direction and leaves Meera’s objection unexamined. There is no immediate safety threat from the shop or its awning. On a different stretch, an unauthorised stack of concrete barriers stands on highway land. The barriers have shifted into the running lane after heavy rain. Traffic has to swerve around them. Officials have made reasonable attempts to locate the person responsible, but waiting to serve notice would cause undue delay. In a third matter, the High Court temporarily protects an existing roadside shed covered by the owner’s application. The order preserves the structure while the court examines the owner’s records. It neither authorises changes to the structure nor reaches a vacant part of the plot. For each situation, identify the exact land or object at issue, the procedure that applies and the facts on which the officer or court is entitled to rely. The purpose of keeping a road safe remains the same. The steps that the rules allow depend on the facts at the site.

What should the officer do before deciding whether Meera’s awning may be removed?

ARemove the entire shop because the general direction applies to every business beside the highway.
BExamine the survey objection and determine whether the awning occupies highway land without authorisation.
CAccept the deed as conclusive proof that the awning is lawful.
DTreat the objection as withdrawn because the main shop is outside the highway boundary.
▸ Show solution
Answer: B. The ordinary rule requires consideration of Meera’s response. The awning is the specific structure the original survey places inside the boundary, and the changed marker may affect that finding.
🧩 Worked example

May officials immediately remove the concrete barriers without serving notice first?

AYes, because the general direction lets the officer dispense with notice in every case.
BOnly if the barriers also threaten a structure forming part of the highway.
COnly if the person who put them there first confirms the highway boundary.
DYes, because their unauthorised occupation poses an immediate traffic danger and serving notice would cause undue delay.
▸ Show solution
Answer: D. The facts satisfy both parts of the emergency rule. An immediate traffic threat qualifies even if the passage identifies no separate threat to a physical highway structure.
🧩 Worked example

What does the High Court’s temporary order establish about the roadside shed?

AIt preserves the existing shed while the court examines the dispute.
BIt settles the owner’s title to the entire plot.
CIt authorises the owner to extend the shed onto the vacant part of the plot.
DIt conclusively establishes that the shed stands on highway land.
▸ Show solution
Answer: A. The stated order covers one existing structure and lasts while the dispute is examined. The owner’s title remains an issue for decision.
🧩 Worked example

Suppose the emergency rule is amended so that any immediate traffic threat from unauthorised occupation of highway land permits removal without prior notice. Now assume the officer can immediately serve notice on the person responsible for the shifted barriers. What follows?

AThe existing opportunity to serve notice makes emergency removal unlawful under the amended rule.
BThe amendment makes the general road safety direction a finding against all highway structures.
CThe officer can immediately remove the barriers if the other stated facts remain the same.
DThe officer can immediately remove Meera’s shop because both sites now fall under the same rule.
▸ Show solution
Answer: C. The amended rule omits the condition about delay in serving notice. The barriers still pose an immediate traffic threat and their unauthorised occupation of highway land is established on the given facts.
🧩 Worked example

Which principle best explains why the general order cannot decide Meera’s dispute by itself?

AOnly a registered owner can challenge a removal notice.
BAny safety directive automatically extends to structures on private land adjoining the highway.
CA correctly prepared survey removes the need to follow the applicable legal procedure.
DA direction covering a category of structures still requires a finding that the individual structure falls within that category.
▸ Show solution
Answer: D. The direction covers an identified class. The officer must check the awning against the boundary and the law governing unauthorised occupation before acting.
🧩 Worked example

Suppose the ordinary rule is amended to require a current site plan to accompany the notice. In a new case, a notice identifies the correct plot and gives Dev time to respond, but the officer sends no site plan. What follows under the amended rule?

AThe notice complies because it identifies the correct plot.
BThe notice fails the amended rule because the required plan was omitted.
CThe officer must withdraw the notice permanently because Dev had a chance to respond.
DThe officer can skip the plan whenever the proposed action implements a general highway order.
▸ Show solution
Answer: B. The change adds a new condition to the ordinary notice process. Correctly identifying the plot and allowing time for a response satisfy other parts of the rule. The notice must also include the current plan.

Practise the principle in other settings

Try a timed CLAT mock
Practise identifying rules and applying them to fresh facts under time pressure.
Open CLAT mock tests

Sources

Frequently asked questions

What did the Supreme Court clarify in the Phalodi highway case?
The April safety directions require removal of unauthorised occupation. Authorities still have to establish the legal status of the site and follow the applicable highway law.
What is a national highway right of way?
It is the legally defined strip of land for the highway. Records and surveys can help establish whether a particular structure falls within it.
Do highway authorities have to give notice before demolition?
The ordinary procedure requires notice identifying the land and an opportunity to respond. The Act permits action without prior notice in specified situations, each with its own conditions.
Did the November judgment stop all highway demolition?
The Court protected the specific disputed structures covered by the applications until the relevant High Court proceedings were disposed of. The wider highway safety directions continue.
What can CLAT ask about the Phalodi ruling?
A passage can give you a removal rule, a boundary dispute and a notice exception. Apply each rule to the precise structure and facts in the question.